SENATE
HOUSE
JOINT
BILL STATUS
STATE LAW
REPORTS
EDUCATIONAL
CONTACT
home
home
Introduced Version House Bill 4697 History

OTHER VERSIONS  -  Enrolled Version - Final Version  |     |  Email
Key: Green = existing Code. Red = new code to be enacted
H. B. 4697


(By Delegates Manuel, Beach, Williams, Anderson,

Stemple, Osborne and Hubbard)


[Originating in the Committee on Education]

[March 4, 1998]


A BILL to amend chapter eighteen of the code of West Virginia, one thousand nine hundred thirty-one, as amended, by adding thereto a new article, designated article nine-e, relating to air quality in new school construction; short title; definitions; standards; tests; and school building authority guidelines and report to legislative oversight commission on education accountability.

Be it enacted by the Legislature of West Virginia:
That chapter eighteen of the code of West Virginia, one thousand nine hundred thirty-one, as amended, be amended by adding thereto a new article, designated article nine-e, to read as follows:
ARTICLE 9E. AIR QUALITY IN NEW SCHOOLS ACT.
§18-9E-1. Short title.
This article is titled and may be cited as the "Air Quality in New Schools Act of 1998."
§18-9E-2. Definitions.
For the purposes of this article, "new school building" means any public school in the state for which design and construction begin after the first day of July, one thousand nine hundred ninety eight, for the education of students in grades kindergarten through twelfth.
§18-9E-3. Air Quality in New Schools.
(a) In an effort to create well ventilated school environments, and notwithstanding any other provision of this code to the contrary, any new school building designed and constructed in the state by a county board after the first day of July one thousand nine hundred ninety eight, regardless of the funding source, shall be designed and constructed in compliance with the current standards of the American society of heating, refrigerating and air conditioning engineers handbook (ASHRAE), the national fire protection association code (NFPA) and the code of the building officials and code administrators (BOCA).
Prior to construction of any new school building in this state, tests, as required by the school building authority guidelines developed under the provisions of subsection (b) of this section, shall be conducted to determine if radon is present at the proposed construction site. If radon is detected, additional tests shall be performed within thirty days to confirm the results. If radon is found in an amount greater than that which is acceptable by industry standards during both tests, any new school building constructed on that site shall incorporate an active soil depressurization system to divert radon from the building site, or utilize any other industry accepted mitigation technique to minimize exposure to radon.
(b) The school building authority shall develop guidelines to assure that any new school building designed after the effective date of this article is designed and constructed in accordance with the ASHRAE, NFPA and BOCA standards, as well as for the required radon testing for new school building construction sites. The school building authority shall submit the guidelines for approval to the legislative oversight commission on education accountability on or before the first day of July, one thousand nine hundred ninety eight. The guidelines shall include the requirement that county boards submit all designs to the school building authority for review and approval prior to preparation of final bid documents.
This Web site is maintained by the West Virginia Legislature's Office of Reference & Information.  |  Terms of Use  |   Email WebmasterWebmaster   |   © 2024 West Virginia Legislature **


X

Print On Demand

Name:
Email:
Phone:

Print